Project Description

Pipeline Release

Project Description

  • Lead Response Contractor to address collecting and processing released contaminant
  • Installation of collection sumps to depths over 18 feet below grade
  • Collection and containerization of over 500,000 gallons of water/ product
  • Excavation, transfer (on site), and containerization of over 2,000 cubic yards of impacted soil
  • Coordinated with Client, Property Owner, Incident Commander to ensure Summit resources were being utilized as efficiently as possible

Project Details

  • Date: Summer 2015

Project Gallery

Download PDF