Tank Cleaning

Project Description

  • Level C PPE, respirator
  • 75 foot diameter aboveground storage tank containing dyed diesel fuel
  • 42,000 gallons of diesel was pumped into 3 frac tanks utilizing a vacuum truck
  • Assisted with the dropping of 5 valves (2-4”, 1-6” & 2-8”) and installation of gaskets and blind flanges on associated piping
  • Interior of tank was pressure washed and floor welds, chime welds, penetration nozzle welds, and floor sheets were sandblasted to allow adequate inspection
  • All cleaning activities were conducted in accordance with API 2015, API 2016, API 2219 and NFPA 326

Project Details

  • Date: Summer 2019